Construction is happening at 10244 Wiesman Drive. The stud framing of the walls for the classrooms and administrative area are in place. Most of those walls have one side covered with the first of two layers of wall material.

The classroom walls will have two layers of material on each side to assist in sound control between classrooms. Some electrical work is also underway. Electrical boxes and conduit have been installed. Plumbing work is being done as well.

In your prayer time, please pray for safety of each person who is working at the building. I looked through the building Friday night, and it is so exciting to see this progress. Praise the Lord!