Once again, it has been too long between updates. I had a week long business trip to Buenos Aires, Argentina. Then a week to catch up on my regular work, and these combined to put me a little behind.
Just a quick note to let you know that there was progress, even with a few wet days. Dryer is definitely better at this point, so pray for dry weather!
There most notable progress was on the exterior walls on the north and east sides of the building. Those walls will have two layers of cement block, with insulation in between. Right now, the work is on the inner layer. The walls have spaces for windows which will be installed at a later date.
For any who may be interested, I have started another blog specifically for an Adult Sunday School class I am teaching. The subject is creation and the flood as taught in Genesis chapters one through 6. That blog is located at www.creationclass.blogspot.com
Thanks for checking in on the building project blog.
Keith